All of the slabs below are in the process of air drying. Most slabs require 2 summers of air drying before they are ready for the kiln. Typically, slabs take 12 weeks in the kiln after air drying properly. Have a short lead time? Check out our kiln dried slabs! Need another angle, we may have it- call and check.
Please call to make an appointment to view slabs in person. To order slabs, please call us to go over status of slabs and shipping details.
503-477-6744.

Big Leaf Maple Slab 061412-01 On sale
Big Leaf Maple Slab 042114-02 On sale
Big Leaf Maple Slab 042114-03 On sale
Big Leaf Maple Slab 042114-06 On sale
031019-04 Big Leaf Maple On sale
  • Prev
  • Page 1 of 7
  • Next