All of the slabs below are in the process of air drying. Most slabs require 2 summers of air drying before they are ready for the kiln. Typically, slabs take 12 weeks in the kiln after air drying properly. Have a short lead time? Check out our kiln dried slabs! Need another angle, we may have it- call and check.

Please call to make an appointment to view slabs in person. To order slabs, please call us to go over status of slabs and shipping details.
503-477-6744.


Elm Slab 032926-03 On sale
Elm Slab 110324-20 On sale
Elm Slab 072222-08 On sale
Elm Slab 100424-05 On sale
Elm Slab 011225-17 On sale
Elm Slab 011225-16 On sale
Elm Slab 011225-10 On sale
Elm Slab 090725-3 On sale
Elm Slab 090725-04 On sale
Elm Slab 011225-18 On sale
Elm Slab 100424-06 On sale
  • Prev
  • Page 1 of 2
  • Next